Summary of Safety Improvements Across Bruce R. Watkins

Kansas City, MO

Added by 2021 Update



Project Number: 46
Organization: Kansas City, MO
Project Name: Safety Improvements Across Bruce R. Watkins
City(ies), County(ies), State: City of Kansas City, Jackson County, Missouri
Routes, interchanges and/or intersections: The Project will address access and safety improvements for east-west vehicular and pedestrian travel across the Bruce R. Watkins corridor between 51st Street and Gregory Boulevard. In particular, focus will be given to three (3) intersections on Bruce R. Watkins: a) at 53rd Street b) at 60th Street c) at Gregory Boulevard (71st Street)
Primary Project Mode: Active Transportation 
Supplementary Project Mode(s): * Bridge * Highway/Roadway )
The Project will identify, design and construct safety improvements for east-west facilities across the Bruce R. Watkins corridor between 51st Street and Gregory Boulevard (71st Street), with emphasis upon pedestrian, bicycle and/or vehicular facilities and improved connections.
Project Purpose: * System operations and management * Other (Vision Zero safety improvements)
Project Description: The project will improve east-west connections across the Bruce R. Watkins corridor, addressing motorized, bicycle and pedestrian conflicts resulting in safer intersections and east-west cross-streets.
Scope: The project aims to improve safety for pedestrians and vehicles (motorized and non-motorized). Project Length = Intersection nodes (east-west) across a 2.45 mile segment of Bruce R. Watkins; Number of Lanes varies for east-west streets. The proposed Project will expand connectivity and accessibility options for people living, working and visiting in southeast Kansas City. Funding will enable better connections, improved access management, and a safer pedestrian and cyclist environment. Bruce R. Watkins (U.S. Highway 71) is an important major arterial within the City; however, it limits the ease of east-west travel on the Citys surface street network. The Project proposes evaluation of the corridor and recommendation of investments that will reinforce and improve east-west connectivity of the Citys multimodal surface transportation network between 51st Street and Gregory Boulevard. Planning, design, and construction phases will identify locations for implementation of improvements to the Citys east-west network. Recommendations may include improved sidewalks, crosswalks, bicycle facilities, lighting, landscaping, intersection improvements, lane configuration modifications, signalization and timing, etc. Improvements may also include a pedestrian bridge, tunnel, or grade-separated intersection, or other solution identified through City, State (MoDOT) and stakeholder input and collaboration. This Project will continue the work of the Citys Vision Zero program and coordinate with the new Transportation / Mobility Plan component of the Citys KC Spirit Playbook comprehensive plan.
Funding Source: MO State
Total Budget in 2019 Dollars: $19,476,630
Decade: Illustrative
Application Score: 120
Constrained / Illustrative: Illustrative
Priority: High
Adds Capacity: No

No public comments submitted.

 


600 Broadway, Suite 200
Kansas City, MO 64105
816/474-4240
Fax 816/421-7758

MARC programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964.
Title VI policy | Americans with Disabilities Act resources

MARC Home Page MARC Transportation Home Page