Summary of I-70/K-7 Interchange KA-1003-11/15 (Phase 10)

KDOT

Added by Amendment 2



Project Number: 1586
Organization: KDOT
Project Name: I-70/K-7 Interchange KA-1003-11/15 (Phase 10)
City(ies), County(ies), State: KCK, Wyandotte, KS
Routes, interchanges and/or intersections: I-70 and K-7
Primary Project Mode: Highway/roadway 
Supplementary Project Mode(s): * Active Transportation * Bridge * Freight )
The design of this project accommodates motorists and freight vehicles. This project will add capacity and reduce bottlenecks at K-7/I-70 by eliminating 4 at-grade signals and replacing with grade separations. Bike/ped crossings are included with the two interchanges at Kansas Ave and 130th Street thus improving safety and mobility for those crossing at those locations. This improvement is expected to improve mobility, access, and connectivity to regional activity centers and destinations for motorists ad freight shippers. Transit currently does not operate in the corridors, but the facility would accommodate service in the future should it be initiated.
Project Purpose: * System expansion (added capacity) * System preservation, rehabilitation or replacement * System operations and management )
Project Description: Reconstruction, capacity and safety improvements of the I-70/K-7 interchange. The interchange concept includes interchanges at I-70, 130th St, Kansas Ave. K-7 and I-70 will have C-D roads to separate thru traffic from ramp traffic. Primary users will be motorists and freight, but design accommodates transit and provides crossing points for bike/ped at the Kansas Ave and 130th Street interchanges.
Scope: Construct K-7 to a 6-Lane Freeway section with a diverging diamond interchange at K-7/130th Street. This project includes reconstruction of 130th St., 131st St. and local frontage roads and construct K-7 to a 6-Lane Freeway section. This project includes completion of the north bound collector-distributor road over 130th St., the overpass at Canaan Center Drive, the Riverview overpass and reconstruction of local roads.
Funding Source: KDOT
Total Budget in 2019 Dollars: $51,510,000
Total Budget in Year of Expenditure dollars (YOE): $64,900,000
Decade: 2020
Application Score: 60
Constrained / Illustrative: Constrained
Priority: Medium
Adds Capacity: Yes

No public comments submitted.

 


600 Broadway, Suite 200
Kansas City, MO 64105
816/474-4240
Fax 816/421-7758

MARC programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964.
Title VI policy | Americans with Disabilities Act resources

MARC Home Page MARC Transportation Home Page