Supplementary Project Mode(s):
|
* Active Transportation
* Highway/Roadway * Other ()
Pleasant Valley Road is currently a narrow, 2 lane street, with no shoulder, curb, gutter or sidewalk, within the City of Pleasant Valley. To the west, Pleasant Valley Road has been widened and improved by the City of Kansas City and Gladstone. To the east, Pleasant Valley Road turns into Liberty Parkway which is a 4 lane road all the way to 291. Between Antioch Road and 291 Highway, the only area that is only 2 lanes is in Pleasant Valley. By widening and improving Pleasant Valley Road within Pleasant Valley, it will alleviate traffic congestion and allow for other modes of transportation such as walking and bicycling.
|
Scope: |
Served by the project: vehicle transportation, bicyclist and pedestrians
Project length: Engineering/survey = 1 year, ROW and bid contract = 1 year, Construction = 18 months.
Number of lanes: 3 lanes, curb and gutter, bicycle lane, pedestrian sidewalk
Currently there are only 2 narrow vehicle lanes, no bicycle lanes and no sidewalk. We except this project to improve the safety for vehicles, bicyclist and pedestrians alike. It will also encourage other modes of transportation besides automotive.
|