Routes, interchanges and/or intersections:
|
155th Street north from Wolf Creek Parkway to Leavenworth Road, there will be multiple intersections that this project will both affect and improve. 155th and Parallel Rd, 155th (Roundabout) and Elm Street (alignment of intersection), 155th Street and Leavenworth Road (Roundabout). The project will affect other intersections but they will not be improved necessarily because of traffic flow issues but they will be improved during construction.
|
Scope: |
This project will serve multiple modes of transportation including bicycle, pedestrian, vehicular and freight. It will consist of a minimum of three lanes, two travel lanes and one center-left hand turn lane, it would have the potential though to be expanded up to five lanes of traffic and turn movement lanes. There would be the potential to include mid-block street crossings, it will improve two of our most congested intersections thus providing an added level of safety. Within this project are two proposed roundabouts and a drainage way crossing that will need expanded. The expected outcome will be the more efficient flow of traffic on one of our main thoroughfares as well as improved connectivity to two of our school buildings with the inclusion of the two roundabouts.
|
Total Budget in Year of Expenditure dollars (YOE):
|
$11,088,000
|