Summary of 183rd Street, Woodland Road to Ridgeview Road

Olathe

Contact Information

Organization: Olathe
Contact person: Cheryl Lambrecht
Title: Traffic Engineer
Phone: 9139719030
E-mail: calambrecht@olatheks.org
Organization address: PO Box 768
  Olathe, KS    66051-0768


General Information

1. Project name: 183rd Street, Woodland Road to Ridgeview Road
2. City(ies), County(ies), State: Olathe, Johnson County, Kansas
3. Routes, interchanges and/or intersections: 183rd Street, from Woodland Road to Ridgeview Road. (Olathe MARC 2050 Submittal Project Number “82” in attached documents shapefile)
4. Primary project mode: Highway/roadway 
5. Supplementary project mode(s): * Active Transportation * Freight * Transit )
183rd is an arterial rural roadway that intersects directly with US-169/K-7. 183rd Street connects local residential traffic to a four-lane divided highway where commercial and freight travel continues to grow yearly. Adding sidewalks, shared use paths, and bike lanes along this corridor will increase Multimodal options other than motorists.
6. Project Purpose: * System expansion (added capacity) * System preservation, rehabilitation or replacement )
7. Project sponsor: Mary Jaegar
mjaeger@olatheks.org
9139719029
8. Total budget in 2019 dollars: $4000000
9. Project description: Improve 183rd Street from a 2 lane rural road to a city street with turn lanes at intersections. New street alignment and right-of-way will be positioned for future 4-lane divided arterial expansion. Improvements will result in added capacity, safer travel, and encourage multimodal transportation.
10. Scope: (approximately 1 mile). The project will consist of improving 183rd Street between Woodland Road and Ridgeview Road from a 2 lane county road to a 2-lane half arterial section with turn lanes at intersections. New street alignment and right-of-way will be positioned for future 4-lane divided arterial expansion. Improvements will include pavement, medians, curb and gutter, storm sewer, street lights, landscaping, and all work pertinent to completing the project. This will add capacity for motorists and improve travel times. Adding turn lanes at each intersection will also improve safety and capacity. New Sidewalk and/or Shared Use Path will be constructed on each side of the street will provide safety for pedestrians and bicyclists.
11. Project schedule: The project is anticipated to be constructed between 2041-2050.

Share your comments

We welcome your feedback on this. Comments from the public will be shared with project sponsors and the evaluating committee. If you wish to be contacted directly about your comment, please note this in the body of the comment. Comments can be viewed by all visitors.


Full name:
E-mail:
Zip code:
Comment:
  Make comment public  
 

Verify that you are human:

What color is this dog's nose?

No comments submitted.

 


600 Broadway, Suite 200
Kansas City, MO 64105
816/474-4240
Fax 816/421-7758

MARC programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964.
Title VI policy | Americans with Disabilities Act resources

MARC Home Page MARC Transportation Home Page