Summary of I-70/K-7 Interchange KA-1003-12 (Phase 7)

KDOT

Contact Information

Organization: KDOT
Contact person: Allison Smith
Title: Environmental Coordinator/MPO Liaison
Phone: 785-296-0341
E-mail: allison.smith@ks.gov
Organization address: 700 SW Harison
  Topeka, KS    66603


General Information

1. Project name: I-70/K-7 Interchange KA-1003-12 (Phase 7)
2. City(ies), County(ies), State: KCK, Wyandotte, KS
3. Routes, interchanges and/or intersections: I-70 and K-7
4. Primary project mode: Highway/roadway 
5. Supplementary project mode(s): * Active Transportation * Bridge * Freight )
The design of this project accomodates motorists and freight vehicles. This project will add capacity and reduce bottlenecks at K-7/I-70 by eliminating 4 at-grade signals and replacing with grade seperations. Bike/ped crossings are included with the two interchanges at Kansas Ave and 130th Street thus improving safety and mobility for those crossing at those locations. This improvement is expected to improve mobility, access, and connectivity to regional activity centers and destinations for motorists ad freight shippers. Transit currently does not operate in the corridors, but the facility would accommodate service in the future should it be initiated.
6. Project Purpose: * System expansion (added capacity) * System preservation, rehabilitation or replacement * System operations and management )
7. Project sponsor: Allison Smith
allison.smith@ks.gov
785-296-0341
8. Total budget in 2019 dollars: $95573000
9. Project description: Reconstruction, capacity and safety improvements of the I-70/K-7 interchange. The interchange concept includes interchanges at I-70, 130th St, Kansas Ave. K-7 and I-70 will have C-D roads to separate thru traffic from ramp traffic. Primary users will be motorists and freight, but design accommodates transit and provides crossing points for bike/ped at the Kansas Ave and 130th Street interchanges.
10. Scope: Construct K-7 to a 6-Lane Freeway section. This project includes the overpasses at Speaker Road & I-70, overpasses at Speaker Road, completion of the eastbound CD road along I-70, and a ramp from northbound K-7 to eastbound I-70. The primary users will be motorists and freight.
11. Project schedule: This project has been placed in FY 2030 until funding is identified at which time the project will be re-evaluated for an appropriate schedule.PE in TIP, #280114

Share your comments

We welcome your feedback on this. Comments from the public will be shared with project sponsors and the evaluating committee. If you wish to be contacted directly about your comment, please note this in the body of the comment. Comments can be viewed by all visitors.


Full name:
E-mail:
Zip code:
Comment:
  Make comment public  
 

Verify that you are human:

What color is this dog's nose?

No comments submitted.

 


600 Broadway, Suite 200
Kansas City, MO 64105
816/474-4240
Fax 816/421-7758

MARC programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964.
Title VI policy | Americans with Disabilities Act resources

MARC Home Page MARC Transportation Home Page