Supplementary Project Mode(s):
|
* Active Transportation * Bridge * Freight
)
The design of this project accommodates motorists and freight vehicles. This project will add capacity and reduce bottlenecks at K-7/I-70 by eliminating 4 at-grade signals and replacing with grade separations. Bike/ped crossings are included with the two interchanges at Kansas Ave and 130th Street thus improving safety and mobility for those crossing at those locations. This improvement is expected to improve mobility, access, and connectivity to regional activity centers and destinations for motorists ad freight shippers. Transit currently does not operate in the corridors, but the facility would accommodate service in the future should it be initiated.
|
Scope: |
Construct K-7 to a 6-Lane Freeway section with a diverging diamond interchange at K-7/130th Street. This project includes reconstruction of 130th St., 131st St. and local frontage roads and construct K-7 to a 6-Lane Freeway section. This project includes completion of the north bound collector-distributor road over 130th St., the overpass at Canaan Center Drive, the Riverview overpass and reconstruction of local roads.
|