Summary of US-69: Reconstruct U.S. 69 from 151St St. to 179th St. and widen to 6-lane freeway using express toll lanes. Modify interchanges at 151st St. and 179th St. This MTP project only includes ROW acquisition and preliminary engineering.

KDOT

Added or Amended by Amendment 3



Amended Project

This project has been amended in the following way.

US-69: Reconstruct U.S. 69 from 151St St. to 179th St. and widen to 6-lane freeway using express toll lanes. Modify interchanges at 151st St. and 179th St. This MTP project only includes ROW acquisition and preliminary engineering.

Project Number: 1319
Organization: KDOT
Project Name: US-69: Reconstruct U.S. 69 from 151St St. to 179th St. and widen to 6-lane freeway using express toll lanes. Modify interchanges at 151st St. and 179th St. This MTP project only includes ROW acquisition and preliminary engineering.
City(ies), County(ies), State: Overland Park, Johnson, KS
Routes, interchanges and/or intersections: US-69
Primary Project Mode: Highway/roadway 
Supplementary Project Mode(s): * Bridge * Freight )
The facility is a major traffic carrier and growth area for Johnson County, and with these improvements KDOT and Overland Park will be mitigating existing traffic congestion and accommodating future travel demand by freight and motorists travelling in and through the region.
Project Purpose: * System expansion (added capacity) * System preservation, rehabilitation or replacement * System operations and management )
Project Description: The intent of this project is to conduct system expansion and congestion mitigation with the addition of through lanes , construction of C-D roads and the reconstruction of interchanges. The project will reconstruct U.S. 69 from 151St St. to 179th St. and widen to 6-lane freeway using express toll lanes. The interchanges at 151st St. and 179th St will be modified. This project only includes Right-of-Way acquisition and preliminary engineering. The primary users will be motorists and freight. The intent of the project is to also address significant safety issues that have resulted in corridor already experiencing crash rates above the statewide average.
Scope: The project will reconstruct U.S. 69 from 151St St. to 179th St. and widen to 6-lane freeway using express toll lanes. The interchanges at 151st St. and 179th St will be modified. This project only includes Right-of-Way acquisition and preliminary engineering.
Funding Source: KDOT
Total Budget in 2019 Dollars: $25,000,000 - Amended
Total Budget in Year of Expenditure dollars (YOE): $25,000,000 - Amended
Decade: 2040 - Amended
Application Score: 45
Constrained / Illustrative: Constrained - Amended
Priority: Medium - Amended
Adds Capacity: Yes

No public comments submitted.

 


600 Broadway, Suite 200
Kansas City, MO 64105
816/474-4240
Fax 816/421-7758

MARC programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964.
Title VI policy | Americans with Disabilities Act resources

MARC Home Page MARC Transportation Home Page