Summary of Lewis and Clark Viaduct Phase 2

KDOT

Contact Information

Organization: KDOT
Contact person: Allison Smith
Title: Environmental Coordinator/MPO Liaison
Phone: 785-296-0341
E-mail: allison.smith@ks.gov
Organization address: 700 SW Harison
  Topeka, KS    66603


General Information

1. Project name: Lewis and Clark Viaduct Phase 2
2. City(ies), County(ies), State: Kansas City, Wyandotte, Kansas
3. Routes, interchanges and/or intersections: I-70
4. Primary project mode: Bridge 
5. Supplementary project mode(s): * Active Transportation * Freight * Highway/Roadway * Transit )
This project will connect the various modes upon bridge replacement as it does now. Motorists and freight shippers will find a much safer facility. Future transit routes to industrial areas and activity centers in Kansas City, KS and Missouri will be accommodated in the corridor. Non motorized travel will utilize connected local trail systems. Further, this project addresses stakeholder concerns regarding continued appropriate access, of freight in particular, to the Fairfax industrial District.
6. Project Purpose: * System preservation, rehabilitation or replacement * System operations and management )
7. Project sponsor: Allison Smith
allison.smith@ks.gov
785-296-0341
8. Total budget in 2019 dollars: $155000000
9. Project description: The intent of this project is to replace rehabilitation and/or replacement of the nine Lewis and Clark Viaduct bridges and associated roadway improvements within the study area that facilitates safe and efficient traveler mobility Improve infrastructure condition, enhance safety, improve traveler mobility and accessibility, and support KCKs economic (re)development initiatives. The primary users would be motorists, non motorized users, and freight shippers Phase 1 of the Lewis and Clark Viaduct projects will be completed in Spring 2020. Phase 2, the EB bridge, will continue to undergo annual bridge inspections. Its condition is a trigger for us to decide when to move forward with replacement project.
10. Scope: In the Spring of 2011, KDOT and several project partners began a study to develop a masterplan for the bridges and associated roadway improvements in the study area. The primary goal of this work was to improve the infrastructure condition of the Lewis and Clark Viaduct by rehabilitating or replacing the aging and deficient bridge and roadway. Within the masterplan, bridges within were prioritized based on need for rehabilitation/replacement. Phase 1 replacement of the WB I-70 bridge is currently underway. This project is for Phase 2 Bridge 031 – EB Viaduct (I-70) which will be replaced as well based on the condition of the truss spans, steel girder floor beams, and steel column bent spans. The expected outcome of the sum of both phases is new bridges, significant safety improvements, geometric improvements, and improved accommodations for all modes.
11. Project schedule: When funding is made available for this project, a schedule of the phases will be determined. It is expected to be built in 2031-2040, but that is dependent on the condition of the EB bridge.

Share your comments

We welcome your feedback on this. Comments from the public will be shared with project sponsors and the evaluating committee. If you wish to be contacted directly about your comment, please note this in the body of the comment. Comments can be viewed by all visitors.


Full name:
E-mail:
Zip code:
Comment:
  Make comment public  
 

Verify that you are human:

What color is this dog's nose?

No comments submitted.

 


600 Broadway, Suite 200
Kansas City, MO 64105
816/474-4240
Fax 816/421-7758

MARC programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964.
Title VI policy | Americans with Disabilities Act resources

MARC Home Page MARC Transportation Home Page