Summary of Shawnee Mission Parkway Expansion Project - Pflumm Road to I-435

Shawnee

Contact Information

Organization: Shawnee
Contact person: Paul Lindstrom
Title: Senior Project Engineer
Phone: 913-742-6234
E-mail: plindstrom@cityofshawnee.org
Organization address: 11110 Johnson Drive
  Shawnee, KS    66203


General Information

1. Project name: Shawnee Mission Parkway Expansion Project - Pflumm Road to I-435
2. City(ies), County(ies), State: Shawnee, Johnson, Kansas
3. Routes, interchanges and/or intersections: Shawnee Mission Parkway is directly accessible through the interchange at I-435.
4. Primary project mode: Highway/roadway 
5. Supplementary project mode(s): * Active Transportation * Bridge * Freight * Transit )
By improving this ditch section road and improving the connection to the local street network, the roadway capacity will be increased and lead to further development along the corridor. The improvements will accommodate all modes of transportation, to include vehicle, pedestrian, bicyclists and future transit needs. This project will be designed to enhance performance of the roadway and provide a safe corridor for all modes of transportation.
6. Project Purpose: * System expansion (added capacity) * System preservation, rehabilitation or replacement * System operations and management )
7. Project sponsor: Paul Lindstrom, P.E.
plindstrom@cityofshawnee.org
913-742-6234
8. Total budget in 2019 dollars: $15000000
9. Project description: Shawnee Mission Parkway is a 4-lane ditch section major arterial that is the Citys main East-West trafficway. This project would widen the existing roadway to 6-lanes for increased efficiencies, provide improved drainage, provide new bridge structures over Renner Road, provide improvements to the ramps at Maurer Road and Lackman Road, and enhance connections to existing pedestrian and bicycle routes.
10. Scope: The improvements to this 2-mile segment of Shawnee Mission Parkway includes expansion from 4-lanes to 6-lanes. This project will accommodate all modes of transportation, to include vehicle, pedestrian, bicyclists, and transit needs. The improvements will incorporate the Citys bicycle and recreational trail plan, which will facilitate healthy and active living.
11. Project schedule: The improvements to the entire Shawnee Mission corridor west of Pflumm, from Pflumm to K-7 Highway, will be divided into two different phases. The first phase, planned for construction in 2030, will include the segment from I-435 to K-7 Highway. The second phase, planned for 2035, will include the segment from Pflumm Road to I-435.

Share your comments

We welcome your feedback on this. Comments from the public will be shared with project sponsors and the evaluating committee. If you wish to be contacted directly about your comment, please note this in the body of the comment. Comments can be viewed by all visitors.


Full name:
E-mail:
Zip code:
Comment:
  Make comment public  
 

Verify that you are human:

What color is this dog's nose?

No comments submitted.

 


600 Broadway, Suite 200
Kansas City, MO 64105
816/474-4240
Fax 816/421-7758

MARC programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964.
Title VI policy | Americans with Disabilities Act resources

MARC Home Page MARC Transportation Home Page