The project will incorporate multimodal systems to accommodate automobiles, transit, public safety vehicles, pedestrian and bicycles in order to maximize and increase mobility throughout the corridor. The project will encourage walkability and bicycle access by providing sidewalks and shared use paths that do not currently exist. These new facilities will provide connection to future pedestrian and bicycle facilities to the north along Antioch Road.
|
Project Description: |
The intent of the project is to maximize mobility and access to existing and future land uses along the corridor, address system preservation and maintenance needs, provide for alternative transportation modes and improve system performance, efficiency and safety. The primary users will be motorists, pedestrians and bicyclists. Motorists will benefit from the increased capacity and safety of the reconstructed roadway which includes additional through lanes and turn lanes. Motorists, pedestrians and bicyclists will all benefit from the addition of street lighting throughout the entire corridor. Bicyclists will be able to utilize the new shared use paths. Pedestrians will be able to utilize the new sidewalks and shared use paths to negotiate the entire corridor and intersections.
|
Scope: |
Reconstruction of 199th Street from a two-lane roadway to a four-lane divided thoroughfare from Antioch to US-69. The project would include curb and gutter, turn lanes, storm sewers and street lighting throughout the half mile corridor. The project also includes 10-foot shared use paths along both sides of roadway. The project will include a roundabout at the intersection of Antioch Road. The project will provide multimodal systems to accommodate automobiles, transit, public safety vehicles, pedestrian and bicycles in order to maximize mobility throughout the corridor. The project will improve walkability and safety for pedestrians by providing ADA compliant facilities and crosswalks. The project will improve bicycle access and safety with the addition of shared use paths on both sides of the roadway. The addition of street lighting throughout the corridor will provide safer accommodations for all modes of transportation.
|
Total Budget in Year of Expenditure dollars (YOE):
|
$10,920,000
|