Summary of MO - HIghway 2 (South Street) at Independence Intersection Improvements

Harrisonville

Contact Information

Organization: Harrisonville
Contact person: Happy
Title: Welch
Phone: 8163808919
E-mail: hwelch@harrisonville.com
Organization address: 300 E. Pearl St.
  Harrisonville, MO    64701-1850


General Information

1. Project name: MO - HIghway 2 (South Street) at Independence Intersection Improvements
2. City(ies), County(ies), State: Harrisonville, Cass County, Missouri
3. Routes, interchanges and/or intersections: Missouri Route 2 and South Independence Street Intersection
4. Primary project mode: Highway/roadway 
5. Supplementary project mode(s): * Highway/Roadway )
Large truck traffic has resulted in an unusual high traffic accident rate because the intersection isnt designed for turning movements of these large vehicles. This project will improve the intersection with larger radius and dedicated turn lanes.
6. Project Purpose: * System preservation, rehabilitation or replacement * System operations and management )
7. Project sponsor: Eric Patterson
epatterson@ci.harrisonville.mo.us
816-380-8964
8. Total budget in 2019 dollars: $1004250
9. Project description: As shown on the attached drawing, this project will increase the turning radius and provide dedicated turn lanes to facilitate the flow of large truck vehicles. This site is located on MoDOT Highway Route 2 and City of Harrisonvilles Independence Street. Large trucks moving freight to other destinations situates these vehicles in with local commuters including school bus traffic. Inadequate widths have caused interactions between the trucks and cars resulting in a high accident rate.
10. Scope: Project will serve automobile, truck, and pedestrian traffic. Convert existing 2-lane each direction intersection into 3 lanes each way, with turn lanes and signals, including pedestrian crossing signals. The expected outcome will the better flow of large trucks through town with a reduced accident rate.
11. Project schedule: 2025 - Planning and environmental clearances 2026 - Surveying and engineering design 2027 - ROW acquisition and utility relocations 2028 - Construction

Share your comments

We welcome your feedback on this. Comments from the public will be shared with project sponsors and the evaluating committee. If you wish to be contacted directly about your comment, please note this in the body of the comment. Comments can be viewed by all visitors.


Full name:
E-mail:
Zip code:
Comment:
  Make comment public  
 

Verify that you are human:

What color is this dog's nose?

Submitted comments

Chris Arthur, B.O. Harrisonville said...

A high priority project both for pedestrian and vehicle concerns.

5/19/2019 8:03:03 AM


 


600 Broadway, Suite 200
Kansas City, MO 64105
816/474-4240
Fax 816/421-7758

MARC programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964.
Title VI policy | Americans with Disabilities Act resources

MARC Home Page MARC Transportation Home Page