Project Description: |
Capacity improvement by increasing this roadway from a 2 lane rural road to a 3 lane arterial roadway which will include adding lanes, bike lanes, shared use paths, sidewalk, street lights, curb and gutter, and storm sewer. Potential traffic signal installations may occur at intersections with other arterial streets throughout this corridor. Improvements will result in added capacity, connectivity, improved travel times, and will encourage multimodal transportation.
|
Scope: |
(Approximately 2 miles) Project will change this roadway from a 2 lane rural road to a 3 lane arterial roadway which will include adding lanes, bike lanes, shared use paths, sidewalk, street lights, curb and gutter, and storm sewer. Potential traffic signal installations may occur at intersections with other arterial streets throughout this corridor as well as adding turn lanes. Improvements will result in added capacity, connectivity, improved travel times, improved safety, and will encourage multimodal transportation. New Sidewalk and/or Shared Use Path will be constructed on each side of the street will provide safety for pedestrians and bicyclists. This project will connect Olathe to the City of Gardner.
|
Total Budget in Year of Expenditure dollars (YOE):
|
$16,720,000
|