Summary of Bundschu Road Improvements

Independence

Contact Information

Organization: Independence
Contact person: Mark Green
Title: City Traffic Engineer
Phone: 8163257608
E-mail: mgreen@indepmo.org
Organization address: 111 E Maple Ave
  Independence, MO    64050


General Information

1. Project name: Bundschu Road Improvements
2. City(ies), County(ies), State: Independence, Jackson, MO
3. Routes, interchanges and/or intersections: Bundschu Road between Susquehanna Ridge and M-7 Highway
4. Primary project mode: Active Transportation 
5. Supplementary project mode(s): * Bridge * Highway/Roadway * Transit )
This project will connect a local transit stop at 24 highway and Susquehanna Road to Bundschu Road utilizing sidewalks and shared use path and neighborhood communities to local parks, schools, and Little Blue Trace Trail and Nature Preserve. Multiple users will be provided opportunities to choose their preferred method of travel with the improvements planned for this corridor.
6. Project Purpose: * System expansion (added capacity) * System preservation, rehabilitation or replacement * System operations and management * Ecosystem Restoration )
7. Project sponsor: Kati Horner Gonzalez, Assistant Director of Public Works, City Engineer
khorner@indepmo.org
816-325-6217
8. Total budget in 2019 dollars: $20000000
9. Project description: The existing roadway is a partially improved roadway that will be widened on the existing alignment with the addition of a center two-way left turn lane, curb and gutter, enclosed storm drain system. A multi-use path is proposed on the north side of the roadway and a sidewalk is proposed along the south side of the roadway. Primary users include multi-modal transportation users with improved access to Fire Station, Parks, Elementary Schools, Little Blue Trace Trail & Nature Preserve, and Transit stops located on US-24 highway.
10. Scope: This project will serve multiple transportation users along a 4.7-mile segment of roadway connecting residential, commercial, and activity center facilities with a 3 lane facility between Susquehanna Ridge and M-7 Highway with improvements including bicycle and pedestrian facilities throughout. Improvements are in close proximity to Fire Station #6 at the east end of the project, which will provide improved response times and safety to incoming and outgoing responses from Bundschu Road.
11. Project schedule: This project (ID #338) is on the Transportation Outlook 2040 plan and was expected to be implemented between 2015 and 2020. Current expectations would implement the project by 2040.

Share your comments

We welcome your feedback on this. Comments from the public will be shared with project sponsors and the evaluating committee. If you wish to be contacted directly about your comment, please note this in the body of the comment. Comments can be viewed by all visitors.


Full name:
E-mail:
Zip code:
Comment:
  Make comment public  
 

Verify that you are human:

What color is this dog's nose?

No comments submitted.

 


600 Broadway, Suite 200
Kansas City, MO 64105
816/474-4240
Fax 816/421-7758

MARC programs that receive federal funding may not discriminate against anyone on the basis of race, color or national origin, according to Title VI of the Civil Rights Act of 1964.
Title VI policy | Americans with Disabilities Act resources

MARC Home Page MARC Transportation Home Page