Supplementary Project Mode(s):
|
* Active Transportation * Bridge
* Transit )
By improving Lackman Road and improving the connection to the local street network, especially to the North at Johnson Drive, the roadway effectiveness and efficiency will be increased and lead to further development along the corridor. The improvements will accommodate all modes of transportation, to include vehicle, pedestrian, bicyclists and future transit needs. This project will be designed to enhance performance of the roadway and provide a safe corridor for all modes of transportation.
|
Project Description: |
The existing cross-section along Lackman Road varies from a 4-lane curbed section roadway and transitions to a 2-lane ditch section road at the north end. The project will provide reconstruction and widening of Lackman Road from 63rd Street to 75th Street, new street construction between 63rd Street and Johnson Drive, and bridge repair and resurfacing within the structure over Shawnee Mission Parkway. This will include updating storm sewer, sidewalk/multi-purpose trail, street-lighting, and pavement markings.
|
Scope: |
The improvements to this 2-mile segment of Lackman includes reconstruction and expansion of this arterial road to provide a minimum of 3-lanes with a multi-purpose trail on one side and sidewalk on the other. The project design will accommodate all modes of transportation, to include vehicle, pedestrian, bicyclists, and transit needs. The improvements will incorporate the Citys bicycle and recreational trail plan, which will facilitate healthy and active living.
|
Total Budget in Year of Expenditure dollars (YOE):
|
$12,600,000
|