Project Number:
|
1113
|
Organization:
|
Olathe
|
Project Name:
|
Quivira from 143rd to 151st
|
City(ies), County(ies), State:
|
Olathe, Johnson County, Kansas
|
Routes, interchanges and/or intersections:
|
Quivira Road
Olathe MARC 2050 Submittal Project Number “21” in attached documents shapefile)
|
Primary Project Mode:
|
Highway/roadway
|
Supplementary Project Mode(s):
|
* Active Transportation * Freight
* Transit )
Quivira is an arterial street that connects commercial and residential developments to I-35 as well as a connection to the City of Overland Park. Bike lanes, shared use paths, and sidewalks will be constructed. Quivira Road is a truck route. With an enhanced roadway system transit routes can be expanded.
|
Project Purpose:
|
* System expansion (added capacity) * System preservation, rehabilitation or replacement
)
|
Project Description: |
Widen Quivira from 143rd Street to 151st Street. (Approximately 1 mile)from a rural 2 lane to a 3 lane arterial. Adding additional thru and turn lanes. Installing bike lanes. Installing sidewalks and shared use paths. Expected outcomes are added capacity, reduced and more reliable travel times, safer travel for all modes of transportation.
|
Scope: |
*Widen Quivira from 143rd Street to 151st Street. (Approximately 1 mile)from a rural 2 lane to a 3 lane arterial. (Approximately 1 mile) This will add capacity for motorists and improve travel times. Adding turn lanes at each intersection will also improve safety & capacity.
*New Sidewalk or Shared Use Path constructed on each side of the street will provide safety for pedestrians and bicyclists.
|
Funding Source:
|
Ks Local
|
Total Budget in 2019 Dollars:
|
None Reported
|
Total Budget in Year of Expenditure dollars (YOE):
|
$17,300,000 - Amended
|
Decade:
|
2020
|
Application Score:
|
75
|
Constrained / Illustrative:
|
Constrained
|
Priority:
|
High
|
Adds Capacity:
|
Yes
|
Amended Project
This project has been amended in the following way.The project description Changes are as follows:
Improve Quivira road from 143rd Street to 151st Street to a 2-lane divided arterial with turn lanes. Reconstruction of the existing facility will include adding turn lanes, installing bike lanes, sidewalks and a shared use path. Expected outcomes are added capacity, reduced and more reliable travel times, safer travel, reduced congestion, reduced emissions and increase in pedestrian access along the corridor.
Project Scope changes:
Reconstruct Quivira from 143rd Street to 151st Street form a rural 2-lane to a 2-lane divided arterial with turn lanes. This will add capacity for motorists, improve travel times, increase safety and reduce emissions along the corridor. Bicycle lanes, new sidewalks and a shared use path constructed on each side of the street will provide safety for pedestrian and bicyclists.
The existing infrastructure to the south of this corridor supports the proposed section. The change in scope is to accommodate the needs of the area now and in to the future. This will also set up the corridor for a future 4-lane arterial if ever needed. The addition of the division will increase safety and allow for additional access control along the corridor.